In two models: three-phase and single-phase & Mixer volume of 1.2 to 1.7 cubic meters & Strong foaming equipment & Cement truck with a di...
The vertical color line involves the following four stages: Preparation, washing and drying /Coloring /Transfer (after coloring) /Furnace
It is used for sieving ceramic slush and granule produced by spray dryer
It is used to turn tiles in large sizes exactly and safely.
It is used to load and unload horizontal roller dryer
It is installed on all width of glazing line
Used to manage tiles
It is installed on the glazing line for cleaning the edges of tile.
It is desugned o dehumidify....
It is installed at the entry of glazing....
It is installed on all width of glazing lines.
This unit is used to collects tiles exiting the press and fettles
In two models: three-phase and single-phase & Mixer volume of 1.2 to 1.7 cubic meters & Strong foaming equipment & Cement truck with a di...
Concrete and steel molds(formwork) of the new generation of the world and steel structures with custom molds and concrete According to th...
Brief introduction about ARIA GHOSTAR PASARGAD KHAVARAN Company
مُصنع قوالب صب الخرسانة بالمعاییر الدولیة فی إیران