CONSTRUCTION OF LIAKHVI BRIDGE DETAIL WORK SCHEDULE
Type of file: MSP-PDF-EXCEL-WBS | Date: Gregorian| Gantt Chart - Critical-Schedule-CPM-Program Progress Scurve-Resource-Cash Flow-WBS–CPM | Duration: 289| Activity Number: 115| Language: English | Range of Date: 2016-2017|Pages:44
مشخصات
- Made in :
- Iran
- Type of file :
- MSP-PDF-EXCEL-WBS
- Date :
- Gregorian
- The chart :
- Gantt chart
- Critical Path :
- Yes
- Updated Schedule :
- Yes
- Schedule :
- Yes
- CPM :
- Yes
- Progress Scurve :
- Yes
- Resource :
- Yes
- Cash Flow :
- Yes
- WBS Chart :
- Yes
- Duration :
- 289
- Activity Number :
- 115
- Language :
- English
- Range of Date :
- 2016-2017
- Pages :
- 44
- Price :
- 13 $
Product description
1. Detailed Scheduling.
2. Resource List table.
3. Resources consumption table
4. Resource column graph.
5. Expected cash flow table.
6. Cash Flow Flow Monthly and Cumulative.
7. Charts for the physical progression of the project (S-curve) to the monthly and cumulative.
8. Network Chart (CPM).
9. WBS chart.
10. Schedule with Gantt Charts Chart, Critical Path, Breakdown Structure, Preconditions Relationship Includes Main Activities:
Liakhvi Bridge |
RIVER LIAKHVI BRIDGE |
DEMOLITION WORKS |
PILES (2 set) |
NORTH&SOUTH |
FOUNDATIONS (2 set) |
NORTH&SOUTH |
COLUMNS (4 set) |
NORTH&SOUTH |
LINTEL BEAMS (2 set) |
NORTH&SOUTH |
SHEET PILING |
NORTH&SOUTH |
SUPERSTRUCTURE (Incremental launching method 2 set) |
SOUTH&NORTH |
EXPANTION JOINTS & ELASTOMERIC BEARING INSTALLATION |
TOP SLAB SOUTH&NORTH SIDE |