Detailed Schedule Conveyance Canal & Tunnel - PartII Aidoghmoosh Irrigation Project
Type of file: Word-EXCEL-CAD-MSP-PDF | Date: Gregorian - Shamsi| Gantt Chart - Critical-Updated Schedule-Schedule-CPM-Program Progress Scurve-Resource-Cash Flow| Duration: 1340| Activity Number: 857| Language: English | Range of Date: 2005 - 2008|Pages:191
مشخصات
- Made in :
- Iran
- Type of file :
- Word-EXCEL-CAD-MSP-PDF
- Date :
- Gregorian - Shamsi
- The chart :
- Gantt chart
- Critical Path :
- Yes
- Updated Schedule :
- Yes
- Schedule :
- Yes
- CPM :
- Yes
- Progress Scurve :
- Yes
- Resource :
- Yes
- Cash Flow :
- Yes
- Duration :
- 1340
- Activity Number :
- 857
- Language :
- English
- Range of Date :
- 2005-2008
- Pages :
- 191
- Price :
- 29 $
Product description
1.Paging
2.Table of contents
3.Map
4.Linear Plan
5.Overall Schedule
6.Detailed Scheduling
7. Critical path
8.Machine Efficiency Table and Executive Boards
9.Machine Schedule
10.Staff Timetable Schedule
11.Human Resources Timetable
12.Material Schedule
13.Timetable for the execution of the operation (work)
14.Expected performance diagram of excavation operations
15.Expected development diagram of tunnel excavation operations
16.Expected Performance Chart of Concrete Operation
17.Expected Lynning Development Chart
18.Expected performance diagram of installation of the Tunnels 2 and 3 of the project
19.Expected Chart of Expected Shutdown Operations for Project Tunnels 2 and 3
20.Expected performance diagram of road service project
21.Project Progress Chart (S-Curve)
22.Tunnel drilling progress chart in meters (S-Curve)
23.Expected Project Progress Achievement Schedule
24.Expected Cash Flow
25.Analysis of a tunnel cycle.
26.Table of business efficiencies
27.CPM network graph
28.Bilingual Schedule (Persian - English)
29.Initial schedule
30.First Edit Schedule
31.Secondary Schedule
32.Schedule a third edit
33.Drilling schedule and tunnel consolidations
34.Flow Tunnel Flow Schedule
35.Schedule the number of machines required for the main tunnel concreting operation
36.Schedule a panel to run externally
37.Schedule a run-of-the-box internal panel
38.Schedule a run-of-the-box External panel......
39.Show hourly execution of a panel-exterior
40.Schedule the rest of work
41. Schedule with Gantt Charts Chart, Critical Path, Breakdown Structure, Preconditions Relationship Includes Main Activities:
Project Execute |
Primary Site Mobilizing |
Secondary Site Mobilizing |
Construction of the Canal |
Construction of Canal after Tunnel |
Construction of Canal from km 9+810 to km 10+060 |
Construction of Technical Structures of Canal from km 9+810 to km 10+060 |
Culvert (23) at km 9+822.967 |
Culvert (24) at km 9+ 932.665 |
Culvert (25) at km 10+024.002 |
Construction of Canal from km 10+060 to km 10+560 |
Construction of Technical Structures of Canal from km 10+060 to km 10+560 |
Culvert (26) at km 10+ 070.947 |
Culvert (27) at km 10+196.265 |
Culvert (28) at km 10+319.409 |
Culvert (29) at km 10+363.005 |
Culvert (30) at km 10+413.283 |
Culvert (31) at km 10+518.427 |
Construction of Canal from km 10+560 to km 11+324 |
Construction of Technical Structures of Canal from km 10+560 to km 11+324 |
Culvert (32) at km 10+717.066 |
Culvert (33) at km 10+921.144 |
Culvert (34) at km 11+119.591 |
Culvert (35) at km 11+166.43 |
Akram Abad Turnout (2) at km 11+282.423 |
Construction of Canal from km 9+310 to km 9+810 |
Construction of Technical Structures of Canal from km 9+310 to km 9+810 |
Culvert (22) at km 9+683.896 |
AKPS4 Turnout at km 9+ 657.743 |
Culvert (21) at km 9+633.246 |
Culvert (20) at km 9+ 567.142 |
Culvert (19) at km 9+ 484.985 |
Culvert (18) at km 9+ 365.560 |
Construction of Canal from km 8+810 to km 9+310 |
Construction of Technical Structures of Canal from km 8+810 to km 9+310 |
Siphon (4) from km 8+778.648 to km 8+ 924.628 |
Culvert (17) at km 9+ 244.185 |
Culvert (16) at km 9+106.286 |
Bridge (7) at km 8+ 986.404 |
Construction of Canal from km 8+310 to km 8+810 |
Construction of Canal Service Road from km 8+310 to km 8+810 |
Main Operation of Canal Service Road from km 8+310 to km 8+810 |
Technical Structures of Canal Service Road from km 8+310 to 8+810 |
Culvert B4-2 at km 0+167.39 |
Culvert B4-1 at km 0+091.23 |
Construction of Canal before Tunnel |
Construction of Canal from km 5+363 to km 6+054 |
Construction of Technical Structures of Canal from km 5+363 to km 6+054 |
Culvert (15) and Drain Well at km 5+944.649 |
Culvert (14) and Drain Well at km 5+743.153 |
Culvert (13) and Drain Well at km 5+482.820 |
Construction of Canal from km 4+863 to km 5+363 |
Construction of Technical Structures of Canal from km 4+863 to km 5+363 |
Culvert (12) and Drain Well at km 5+153.533 |
Culvert (11) and Drain Well at km 4+947.262 |
Construction of Canal from km 4+363 to km 4+863 |
Construction of Technical Structures of Canal from km 4+363 to km 4+863 |
Culvert (10) and Drain Well at km 4+749.395 |
Bridge (6) at km 4+633.642 |
Siphon (3) from km 4+533.597 to km 4+606.238 |
Bridge (5) at km 4+526.545 |
Construction of Canal Service Road from km 4+363 to km 4+863 |
Main Operation of Canal Service Road from km 4+363 to km 4+863 |
Technical Structures of Canal Service Road from km 4+363 to km 4+863 |
Construction of Canal from km 3+863 to km 4+363 |
Construction of Technical Structures of Canal from km 3+863 to km 4+363 |
Culvert (9) and Drain Well at km 4+200.000 |
Bridge (4) at km 4+057.584 |
Siphon (2) from km 3+952.754 to km 4.030.119 |
Bridge (3) at km 3+897.184 |
Construction of Canal Service Road from km 3+863 to km 4+363 |
Main Operation of Canal Service Road from km 3+863 to km 4+363 |
Technical Structures of Canal Service Road from km 3+863 to km 4+363 |
Construction of Canal from km 3+363 to km 3+863 |
Construction of Technical Structures of Canal from km 3+363 to km 3+863 |
Culvert (8) and Drain Well at km 3+768.959 |
Culvert (7) and Drain Well at km 3+612.166 |
Culvert (6) and Drain Well at km 3+382.852 |
Construction of Canal Service Road from km 3+363 to km 3+863 |
Main Operation of Canal Service Road from km 3+363 to km 3+863 |
Technical Structures of Canal Service Road from km 3+363 to km 3+863 |
Construction of Canal from km 2+863 to km 3+363 |
Construction of Technical Structures of Canal from km 2+863 to km 3+363 |
Bridge (2) at km 3+267.894 |
Siphon (1) from km 3+025.783 to km 3+251.603 |
Bridge (1) at km 3+001.288 |
Culvert (5) and Drain Well at km 2+953.184 |
Construction of Canal Service Road from km 2+863 to km 3+363 |
Main Operation of Canal Service Road from km 2+863 to km 3+363 |
Technical Structures of Canal Service Road from km 2+863 to km 3+363 |
Construction of Canal from km 2+363 to km 2+863 |
Construction of Technical Structures of Canal from km 2+363 to km 2+863 |
Culvert (4) and Drain Well at km 2+671.498 |
Culvert (3) and Drain Well at km 2+544.003 |
Culvert (2) and Drain Well at km 2+488.780 |
Side SpillWay and check from km 2+452.590 to 2+480.920 |
Culvert (1) and Drain Well at km 2+431.139 |
Construction of the Tunnel |
Executive Operation of Tunnel from Output |
Executive Operation for Tunnel Portal from Output |
Tunnelling from Output |
Tunnel Lining from Output |
Executive Operation of Tunnel from Input |
Executive Operation for Tunnel Portal from Input |
Tunnelling from Input |
Tunnel Lining from Input |
Executive Operation for Tunnel Portal from Adit |
Executive Operation of Tunnel from Adit to Output |
Tunnelling from Adit to Output |
Executive Operation of Tunnel from Adit to Input |
Tunnelling from Adit to Input |