Detailed Schedule Conveyance Canal & Tunnel - PartII Aidoghmoosh Irrigation Project

Type of file: Word-EXCEL-CAD-MSP-PDF | Date: Gregorian - Shamsi| Gantt Chart - Critical-Updated Schedule-Schedule-CPM-Program Progress Scurve-Resource-Cash Flow| Duration: 1340| Activity Number: 857| Language: English | Range of Date: 2005 - 2008|Pages:191

مشخصات

Made in :
Iran
Type of file :
Word-EXCEL-CAD-MSP-PDF
Date :
Gregorian - Shamsi
The chart :
Gantt chart
Critical Path :
Yes
Updated Schedule :
Yes
Schedule :
Yes
CPM :
Yes
Progress Scurve :
Yes
Resource :
Yes
Cash Flow :
Yes
Duration :
1340
Activity Number :
857
Language :
English
Range of Date :
2005-2008
Pages :
191
Price :
29 $

Product description

1.Paging

2.Table of contents

3.Map

4.Linear Plan

5.Overall Schedule

6.Detailed Scheduling

7. Critical path

8.Machine Efficiency Table and Executive Boards

9.Machine Schedule

10.Staff Timetable Schedule

11.Human Resources Timetable

12.Material Schedule

13.Timetable for the execution of the operation (work)

14.Expected performance diagram of excavation operations

15.Expected development diagram of tunnel excavation operations

16.Expected Performance Chart of Concrete Operation

17.Expected Lynning Development Chart

18.Expected performance diagram of installation of the Tunnels 2 and 3 of the project

19.Expected Chart of Expected Shutdown Operations for Project Tunnels 2 and 3

20.Expected performance diagram of road service project

21.Project Progress Chart (S-Curve)

22.Tunnel drilling progress chart in meters (S-Curve)

23.Expected Project Progress Achievement Schedule

24.Expected Cash Flow

25.Analysis of a tunnel cycle.

26.Table of business efficiencies

27.CPM network graph

28.Bilingual Schedule (Persian - English)

29.Initial schedule

30.First Edit Schedule

31.Secondary Schedule

32.Schedule a third edit

33.Drilling schedule and tunnel consolidations

34.Flow Tunnel Flow Schedule

35.Schedule the number of machines required for the main tunnel concreting operation

36.Schedule a panel to run externally

37.Schedule a run-of-the-box internal panel

38.Schedule a run-of-the-box External panel......

39.Show hourly execution of a panel-exterior

40.Schedule the rest of work

41. Schedule with Gantt Charts Chart, Critical Path, Breakdown Structure, Preconditions Relationship Includes Main Activities:

Project Execute

Primary Site Mobilizing

Secondary Site Mobilizing

Construction of the Canal

Construction of Canal after Tunnel

Construction of Canal from km 9+810 to km 10+060

Construction of Technical Structures of Canal from km 9+810 to km 10+060

Culvert (23) at km 9+822.967

Culvert (24) at km 9+ 932.665

Culvert (25) at km 10+024.002

Construction of Canal from km 10+060 to km 10+560

Construction of Technical Structures of Canal from km 10+060 to km 10+560

Culvert (26) at km 10+ 070.947

Culvert (27) at km 10+196.265

Culvert (28) at km 10+319.409

Culvert (29) at km 10+363.005

Culvert (30) at km 10+413.283

Culvert (31) at km 10+518.427

Construction of Canal from km 10+560 to km 11+324

Construction of Technical Structures of Canal from km 10+560 to km 11+324

Culvert (32) at km 10+717.066

Culvert (33) at km 10+921.144

Culvert (34) at km 11+119.591

Culvert (35) at km 11+166.43

Akram Abad Turnout (2) at km 11+282.423

Construction of Canal from km 9+310 to km 9+810

Construction of Technical Structures of Canal from km 9+310 to km 9+810

Culvert (22) at km 9+683.896

AKPS4 Turnout at km 9+ 657.743

Culvert (21) at km 9+633.246

Culvert (20) at km 9+ 567.142

Culvert (19) at km 9+ 484.985

Culvert (18) at km 9+ 365.560

Construction of Canal from km 8+810 to km 9+310

Construction of Technical Structures of Canal from km 8+810 to km 9+310

Siphon (4) from km 8+778.648 to km 8+ 924.628

Culvert (17) at km 9+ 244.185

Culvert (16) at km 9+106.286

Bridge (7) at km 8+ 986.404

Construction of Canal from km 8+310 to km 8+810

Construction of Canal Service Road from km 8+310 to km 8+810

Main Operation of Canal Service Road from km 8+310 to km 8+810

Technical Structures of Canal Service Road from km 8+310 to 8+810

Culvert B4-2 at km 0+167.39

Culvert B4-1 at km 0+091.23

Construction of Canal before Tunnel

Construction of Canal from km 5+363 to km 6+054

Construction of Technical Structures of Canal from km 5+363 to km 6+054

Culvert (15) and Drain Well at km 5+944.649

Culvert (14) and Drain Well at km 5+743.153

Culvert (13) and Drain Well at km 5+482.820

Construction of Canal from km 4+863 to km 5+363

Construction of Technical Structures of Canal from km 4+863 to km 5+363

Culvert (12) and Drain Well at km 5+153.533

Culvert (11) and Drain Well at km 4+947.262

Construction of Canal from km 4+363 to km 4+863

Construction of Technical Structures of Canal from km 4+363 to km 4+863

Culvert (10) and Drain Well at km 4+749.395

Bridge (6) at km 4+633.642

Siphon (3) from km 4+533.597 to km 4+606.238

Bridge (5) at km 4+526.545

Construction of Canal Service Road from km 4+363 to km 4+863

Main Operation of Canal Service Road from km 4+363 to km 4+863

Technical Structures of Canal Service Road from km 4+363 to km 4+863

Construction of Canal from km 3+863 to km 4+363

Construction of Technical Structures of Canal from km 3+863 to km 4+363

Culvert (9) and Drain Well at km 4+200.000

Bridge (4) at km 4+057.584

Siphon (2) from km 3+952.754 to km 4.030.119

Bridge (3) at km 3+897.184

Construction of Canal Service Road from km 3+863 to km 4+363

Main Operation of Canal Service Road from km 3+863 to km 4+363

Technical Structures of Canal Service Road from km 3+863 to km 4+363

Construction of Canal from km 3+363 to km 3+863

Construction of Technical Structures of Canal from km 3+363 to km 3+863

Culvert (8) and Drain Well at km 3+768.959

Culvert (7) and Drain Well at km 3+612.166

Culvert (6) and Drain Well at km 3+382.852

Construction of Canal Service Road from km 3+363 to km 3+863

Main Operation of Canal Service Road from km 3+363 to km 3+863

Technical Structures of Canal Service Road from km 3+363 to km 3+863

Construction of Canal from km 2+863 to km 3+363

Construction of Technical Structures of Canal from km 2+863 to km 3+363

Bridge (2) at km 3+267.894

Siphon (1) from km 3+025.783 to km 3+251.603

Bridge (1) at km 3+001.288

Culvert (5) and Drain Well at km 2+953.184

Construction of Canal Service Road from km 2+863 to km 3+363

Main Operation of Canal Service Road from km 2+863 to km 3+363

Technical Structures of Canal Service Road from km 2+863 to km 3+363

Construction of Canal from km 2+363 to km 2+863

Construction of Technical Structures of Canal from km 2+363 to km 2+863

Culvert (4) and Drain Well at km 2+671.498

Culvert (3) and Drain Well at km 2+544.003

Culvert (2) and Drain Well at km 2+488.780

Side SpillWay and check from km 2+452.590 to 2+480.920

Culvert (1) and Drain Well at km 2+431.139

Construction of the Tunnel

Executive Operation of Tunnel from Output

Executive Operation for Tunnel Portal from Output

Tunnelling from Output

Tunnel Lining from Output

Executive Operation of Tunnel from Input

Executive Operation for Tunnel Portal from Input

Tunnelling from Input

Tunnel Lining from Input

Executive Operation for Tunnel Portal from Adit

Executive Operation of Tunnel from Adit to Output

Tunnelling from Adit to Output

Executive Operation of Tunnel from Adit to Input

Tunnelling from Adit to Input

اطلاعات تماس
بیوگرافی شرکت

Kabiri Co. (Learning Project Management, Planning and Pro...

Iran (Islamic Republic of), Tehran

Business type

Manufacturer, Retailer, Service provider

Services/Products

Planning, Project Control, Delayed Delivery, Learning Project Management, Learning Planning, Learning Project Control, Schedule Consultation, Computer repair, computer Services, Computer sales, Laptop sales, Computer help, Construction scheduling schedule, Recruitment, Planning with msp, Planning and control of construction projects

Business entity:

Public joint stock company

دسته‌بندی Products and Services